首页 | 本学科首页   官方微博 | 高级检索  
     


Status of design and procurement activities in JT-60SA
Authors:P Barabaschi  Y Kamada  S Ishida
Affiliation:1. JT-60SA EU Home Team, Fusion for Energy, Boltzmannstr 2, Garching 85748, Germany;2. 2 JT-60SA JA Home Team, Japan Atomic Energy Agency, 801-1 Mukoyama, Naka, Ibaraki 311-0193, Japan;3. JT-60SA Project Team, Japan Atomic Energy Agency, 801-1 Mukoyama, Naka, Ibaraki 311-0193, Japan
Abstract:The JT-60SA experiment is one of the three projects to be undertaken in Japan as part of the Broader Approach Agreement, conducted jointly by Europe and Japan, and complementing the construction of ITER in Europe. It is a fully superconducting tokamak capable of confining break-even equivalent deuterium plasmas with equilibria covering high plasma shaping with a low aspect ratio at a maximum plasma current of Ip = 5.5 MA. In late 2007 the BA Parties, prompted by cost concerns, asked the JT-60SA Team to carry out a re-baselining effort with the purpose to fit in the original budget while aiming to retain the machine mission, performance, and experimental flexibility. Subsequently the Integrated Project Team has undertaken a machine re-optimization followed by engineering design activities aimed to reduce costs while maintaining the machine radius and plasma current. This effort led the Parties to the approval of the new design in late 2008 and hence final design and procurement activities have commenced. The paper will describe the process leading to the re-baselining, the resulting final design and technical solutions and the present status of procurement activities.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号