分期施工蓄水时拱坝与背管共同工作的分析
引用本文:陈开道,张学勤.分期施工蓄水时拱坝与背管共同工作的分析[J].武汉大学学报(工学版),1997(2).
作者姓名:陈开道  张学勤
摘    要:给出一种分析模型,以湖南东江拱坝为例,进行了实际分期施工及蓄水过程的结构分析,论述了它的可能性,指出了存在的问题,并对分期的技巧提出了参考建议

关 键 词:拱坝  分期施工  分期蓄水

Analyzing Combined Working of Arch Dam with Penstock on Dam Batter during Stage Construction and Impounding
Cheng Kaidao\ Zhang Xueqin.Analyzing Combined Working of Arch Dam with Penstock on Dam Batter during Stage Construction and Impounding[J].Engineering Journal of Wuhan University,1997(2).
Authors:Cheng Kaidao\ Zhang Xueqin
Affiliation:College of Hydroelectric Engineering
Abstract:In this article,an analytic model has been given and the arch dam of Dongjiang River in Hunan Province is used to analyze the process of stage construction and impounding.This article also analyzes possibility and existing problems.At last the referential suggestion on the technique of stage construction has been put forward.
Keywords:arch dam  stage construction  stage impounding