Through the engineering practice of 32-m double-line simply-supported post-prestressed box beam in Wuhan-Guangzhou Passenger Dedicated Line, this article introduced in detail the prestressing technology from theatrical calculation to in-site construction control in prestressed concrete box beam construction.