首页 | 本学科首页   官方微博 | 高级检索  
     


Restoring recloser-fuse coordination by optimal fault current limiters planning in DG-integrated distribution systems
Affiliation:1. ESTSetúbal-Instituto Politécnico Setúbal/DEE, Setúbal, Portugal;2. CTS/UNINOVA and FCT/UNL, Lisbon, Portugal;3. INESC-ID Lisboa, Portugal;1. Faculty of Engineering, Cairo University, Egypt;2. Institute Centre for Energy, Masdar Institute of Science and Technology, Abu Dhabi, United Arab Emirates
Abstract:In this paper, the Fault Current Limiter (FCL) is used to restore the coordination between the protection devices in distribution systems with high-level of DG penetration. The FCL allocation may be described as an optimization problem involving multiple objective functions which are contradictory and of different dimensions. So, it is formulated as a multi-objective constrained nonlinear programming problem. The interaction among different objectives gives rise to a set of compromised solutions, largely known as the Pareto-optimal solutions. The objectives are to simultaneously minimize: the increase in fault current levels due to the penetration of DG, voltage sag, and the total cost (size) of required limiters. The optimization problem is solved using Particle Swarm Optimization (PSO). The method is applied to two distribution test systems. Effects of different operating factors are assessed. Comparative analysis of results is provided.
Keywords:Protection coordination  Fault current limiter  Voltage sag  DG
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号