工期计划中确定关键路径的简化方法
引用本文:李铭恩,方东平,吴升厚. 工期计划中确定关键路径的简化方法[J]. 施工技术, 2001, 30(12): 33-35
作者姓名:李铭恩  方东平  吴升厚
作者单位:李铭恩(清华大学,北京,100084)      方东平(清华大学,北京,100084)      吴升厚(清华大学,北京,100084)
摘    要:提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中.在模拟过程中该方法较传统的CPM法确定关键路径更有效且节约计算机资源.

关 键 词:施工组织  单代号网络  双代号网络  进度计划
文章编号:1002-8498(2001)12-0033-03
修稿时间:2001-07-16

Simplified Method to Identify the Critical Path in Schedule Planning
LI Ming en,FANG Dong ping,WU Sheng hou. Simplified Method to Identify the Critical Path in Schedule Planning[J]. Construction Technology, 2001, 30(12): 33-35
Authors:LI Ming en  FANG Dong ping  WU Sheng hou
Abstract:This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule. This method is more efficient than the normal CPM in identifying the critical path.
Keywords:construction management  activity on node network  activity on line network  process planning