首页 | 本学科首页   官方微博 | 高级检索  
     

鄂尔多斯盆地长7页岩油藏水平井生产制度
引用本文:万晓龙,张原立,樊建明,李桢,张超.鄂尔多斯盆地长7页岩油藏水平井生产制度[J].新疆石油地质,2022,43(3):329-334.
作者姓名:万晓龙  张原立  樊建明  李桢  张超
作者单位:1.中国石油大学(北京) 地球科学学院,北京 1022492.中国石油 长庆油田分公司 a.第五采油厂;b.勘探开发研究院,西安 710018
基金项目:国家科技重大专项(2017ZX05069)
摘    要:为合理制定长7页岩油藏水平井的生产制度,保障长7页岩油藏的单井产量,基于鄂尔多斯盆地长7页岩油藏开发的理论研究与生产资料,通过计算水平井体积压裂后人工裂缝缝内压力传播距离与时间的关系,以传播到边界的压力不随时间变化的原则确定合理闷井时间为40 d;高含水排液阶段结束的标志是采出水矿化度分析值与原始地层水相近或水平井压裂液置换率大于60%;通过定量分析水平井单段及百米水平段生产规律,建立动态关系式,确定各阶段合理的产液量。

关 键 词:鄂尔多斯盆地  页岩油  水平井  体积压裂  准自然能量  闷井  排液  生产制度  
收稿时间:2022-02-22

Production System of Horizontal Well in Shale Oil Reservoirs of Chang 7 Member,Ordos Basin
WAN Xiaolong,ZHANG Yuanli,FAN Jianming,LI Zhen,ZHANG Chao.Production System of Horizontal Well in Shale Oil Reservoirs of Chang 7 Member,Ordos Basin[J].Xinjiang Petroleum Geology,2022,43(3):329-334.
Authors:WAN Xiaolong  ZHANG Yuanli  FAN Jianming  LI Zhen  ZHANG Chao
Affiliation:1. School of Geosciences, China University of Petroleum, Beijing 102249, China2. PetroChina Changqing Oilfield Company, a.No.5 Oil Production Plant; b.Research Institute of Exploration and Development, Xi'an, Shaanxi 710018, China
Abstract:To ensure the production of shale oil in Chang 7 member, Ordos basin, this paper discussed the production system of the horizontal well in Chang 7 member based on the theoretical research and production data. By establishing the relationship between the distance of the pressure propagation boundary from fractures induced by volume fracturing in horizontal well and the time, and assuming that the pressure propagated to the boundary does not change with time, the reasonable well soaking period is determined to be 40 d. It is considered that the high-watercut drainage stage ends when the analyzed salinity of the produced water is similar to the salinity of initial formation water, or the replacement rate of fracturing fluid in horizontal wells is greater than 60%. By quantitatively analyzing the production profile of a single section and a 100-m horizontal section in the horizontal well, the dynamic relationship was established for determining a reasonable fluid production for each stage.
Keywords:Ordos basin  shale oil  horizontal well  volume fracturing  quasi-natural energy  well soaking  drainage  production system  
点击此处可从《新疆石油地质》浏览原始摘要信息
点击此处可从《新疆石油地质》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号