首页 | 本学科首页   官方微博 | 高级检索  
     

秦山300MW核电机组全范围仿真机测试验收
引用本文:房晓东. 秦山300MW核电机组全范围仿真机测试验收[J]. 核动力工程, 1996, 17(3): 218-223
作者姓名:房晓东
作者单位:亚洲仿真控制系统工程有限公司!广东珠海,519015
摘    要:介绍了秦山300MW核电机组全范围仿真机的测试验收的整个过程,包括:验收测试规程的形成,工厂内部预测试和工厂用户测试。并分析了测试验收过程中存在的重大问题及解决的办法。

关 键 词:核电厂 秦山 核发电机组 仿真机 测试验收

Acceptance Test of Full Scope Simulator for Qinshan 300MW Nuclear Power Unit
Fang Xiaodong. Acceptance Test of Full Scope Simulator for Qinshan 300MW Nuclear Power Unit[J]. Nuclear Power Engineering, 1996, 17(3): 218-223
Authors:Fang Xiaodong
Abstract:The paper introduces the whole acceptance test procedure of Qinshan 300MW Nuclear Power Unit Full Scope Simulator.The following stages are included:formation of Accep tance Test Procedure documents;preacceptance test of the simulator in factory;Accep tance Test of the simulator in factory,The main problems in acceptance test procedure and measures for solving them are analysed.
Keywords:Qinshan Nuclear Power Plant Full scope simulator Acceptance test  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号