首页 | 本学科首页   官方微博 | 高级检索  
     

关于镀锡板生产线接地问题处理
引用本文:郑士富,杨玉亭,弭洪涛.关于镀锡板生产线接地问题处理[J].控制工程,1998(6).
作者姓名:郑士富  杨玉亭  弭洪涛
作者单位:吉林电气化高等专科学校!132021(郑士富),沈阳铝镁设计院(杨玉亭),吉林电专(弭洪涛)
摘    要:着重阐述了“弗洛斯坦”(Flrroston)型作业电镀锡生产线接地问题的特殊性,并通过对软熔装置的工作机理及接地问题的详细分析,提出了相应的处理方案,从而提高了生产系统和控制系统的安全性及可靠性。在国内电镀生产领域中有较高实用价值。

关 键 词:电镀锡  软熔装置  接地电流

The Process of the Earth Problem To the Electrotinning Production Line
Zheng Shifu.The Process of the Earth Problem To the Electrotinning Production Line[J].Control Engineering of China,1998(6).
Authors:Zheng Shifu
Affiliation:Zheng Shifu (Jilin Electrification College)Yang Yuting (hengyang Aluminum and Magnesium institute)Mi Hongtao(JiLin Electrification College)
Abstract:this paper mainly illuminates the speciality of the earth Problem to the Flrroston electrotinning production line,and also advances the corresponding solution by analysing the theory of the melted coating unit and the earth problem. The security and reliabilityare improved accordingly. The method put forward in the paper has very high practical value in the field of electronic plate.
Keywords:electrotinning  melted coating unit  earth current
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号