首页 | 本学科首页   官方微博 | 高级检索  
     

武汉地区预制桩设计与施工产生矛盾的统一方法
引用本文:刘祖德. 武汉地区预制桩设计与施工产生矛盾的统一方法[J]. 土工基础, 2008, 22(2): 84-87
作者姓名:刘祖德
作者单位:武汉大学,武汉,430072
摘    要:针对武汉地区工程地质条件,论述了预制桩推广应用的优越性。同时重点指出预制桩设计中常见的问题是设计桩长与施工中可能沉入深度产生矛盾,致使出现大量桩基质量事故。并提出若干解决这一矛盾的方法。

关 键 词:预制桩  高强度管桩  设计  施工
文章编号:1004-3152(2008)02-0084-04

The Way to Solve an Contradiction from Design and Construction to Precast Pile
LIU Zu de. The Way to Solve an Contradiction from Design and Construction to Precast Pile[J]. Soie Engineering and Foundation, 2008, 22(2): 84-87
Authors:LIU Zu de
Affiliation:LIU Zu de (Wuhan University, Wuhan 430072, China)
Abstract:Under the engineering geology conditions in Wuhan, the superiority of precast pile is discussed. Then the familiar problem in design of precast pile is pointed. The problem is an contradiction between designed pile length and potential embedment depth, which has caused many accidents. In the paper, some ideas are also put forward to solve the contradiction.
Keywords:precast pile   high-strength tubular pile   design   construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号