首页 | 本学科首页   官方微博 | 高级检索  
     

苗溪水电站引水隧洞混凝土衬砌施工
引用本文:梁岗伟. 苗溪水电站引水隧洞混凝土衬砌施工[J]. 西北水电, 2004, 0(2): 32-33
作者姓名:梁岗伟
作者单位:中国水利水电第五工程局,成都,610066
摘    要:总结了苗溪水电站引水隧洞混凝土衬砌的施工方法,特别是在小断面隧洞工程混凝土衬砌施工中,由于隧洞较长,施工工期短,开挖交叉作业,采用较小型的HBT-20混凝土泵施工,使工程达到优质高效。

关 键 词:小断面隧洞 混凝土浇筑 交叉作业 施工经验
文章编号:1006-2610(2004)02-0032-02
修稿时间:2003-07-24

Construction of intake tunnel concrete lining of Miaoxi hydropower station
LIANG Gang-wei. Construction of intake tunnel concrete lining of Miaoxi hydropower station[J]. Northwest Water Power, 2004, 0(2): 32-33
Authors:LIANG Gang-wei
Abstract:The construction method of the Miaoxi intake tunnel concrete lining is summarized. Particularly in construction of light section tunnel concrete lining, due to long tunnel, short construction period and cross excavating operations, construction by adopting pony HBT-20 pumpcrete machine can complete the project in high efficiency and quality.
Keywords:light section tunnel  concreting  cross operations  construction experience
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号