改进未确知测度理论的隧道塌方风险评估及控制
引用本文:陈建宏,宋灿,邬书良,李迁威.改进未确知测度理论的隧道塌方风险评估及控制[J].黄金科学技术,2016,24(6):64-71.
作者姓名:陈建宏  宋灿  邬书良  李迁威
作者单位:1.中南大学资源与安全工程学院,湖南 长沙 410083; 2.武汉科技大学资源与环境工程学院 ,湖北 武汉 430081
基金项目:国家自然科学基金项目"地下金属矿采掘计划可视化优化方法与技术研究"(51374242),国家自然科学基金青年基金项目"基于人工智能的矿山技术经济指标动态优化研究"(51404305),教育部高等学校博士学科点专项科研基金项目(博导类)"基于任务单元的地下矿山采掘计划可视化编制技术研究"(20130162110009)
摘    要:为确保隧道施工安全,建立了改进未确知测度理论,并应用置信度识别准则来确定隧道塌方风险等级。风险评估步骤如下:首先,选取围岩等级、隧道埋深、地下水、偏压角度和不良地质因素作为静态孕险指标,大气降水、开挖跨度、支护措施和监控测量作为动态致险指标;其次,采用物元分析代替熵权分析来确定静态和动态组合权重;最后提出风险规避方法,从而有效降低风险等级。将改进未确知测度理论风险评价方法成功应用于关口垭部分隧道风险评价中,既能准确判断风险等级,又能有效控制风险因素,为隧道风险评价提供了新方向。

关 键 词:隧道塌方  物元分析  未确知测度  风险评估  风险控制  
收稿时间:2015-09-21
修稿时间:2015-12-06

Assessment and Risk Control of Tunnel Collapse Based on the Improved Unascertained Measure Model
CHEN Jianhong,SONG Can,WU Shuliang,LI Qianwei.Assessment and Risk Control of Tunnel Collapse Based on the Improved Unascertained Measure Model[J].Gold Science and Technololgy,2016,24(6):64-71.
Authors:CHEN Jianhong  SONG Can  WU Shuliang  LI Qianwei
Affiliation:1.School of Resources and Safety Engineering,Central South University,Changsha   410083,Hunan,China;; 2.School of Resourse and Environment Engineering,Wuhan University of Science and Technology,Wuhan 430081,Hubei,China
Abstract:To ensure the safety of constructing tunnels,an improved unascertained measured model was built,using the confidence criterion,to ensure the risk level of tunnel collapse.The steps of risk assessment include three steps.Firstly selected rock level,depth,ground water conditions,bias angle and unfavorable geology as static indexes,meteoric water,excavation span,support measure and monitor measure as dynamic indexes.Secondly,the matter-element analysis method replacing the entropy weight analysis was used to determine the combination weights of static indexes and dynamic indexes.Finally,a risk aversion method was proposed,which is to lower the risk grade.The presented approach had been applied successfully in evaluating the construction risk of part of Guankouya tunnel.Not only did it judge risk grades exactly,but also it controlled risk factors effectively.This method offered new directions for assessment and risk control of tunnel collapse.
Keywords:tunnel collapse  matter-element analysis  unascertained measure model  risk assessment  risk control  