1200kt/a焦化改造危险因素分析及安全对策
引用本文:孔细模.1200kt/a焦化改造危险因素分析及安全对策[J].石油化工安全环保技术,2005,21(5):29-32.
作者姓名:孔细模
作者单位:中国石化长岭分公司,湖南,长岭,414012
摘    要:通过预先分析1200 kt/a焦化改造的内容及工程量、装置工艺流程、操作运行条件、施工周围环境以及外界的危险因素,找出边生产边施工及装置停工改造的关键危险因素,制定出防止事故的安全对策,运用HSE的管理方法,落实各项安全措施,达到安全施工的目的。

关 键 词:焦化改造  危险因素  安全对策
修稿时间:2005年3月7日

Hazard Analysis and Safety Countermeasure in Revamping of 1200Kt/a Delayed Cocking Plant
Kong Ximo.Hazard Analysis and Safety Countermeasure in Revamping of 1200Kt/a Delayed Cocking Plant[J].Petrochemical Safety and Environmental Protection Technology,2005,21(5):29-32.
Authors:Kong Ximo
Affiliation:Kong Ximo No.1 Complex of SINOPEC Changling Branch,P.C 414012
Abstract:In advance,revamping content,engineering workload,process flowsheet,operation conditions,con- struction environment and external risk factors were ana- lyzed in revamping 1200 Kt/a delayed cocking plant, then pivotal risk factors were found out,when construc- tion will be made at the same time of operation and re- vamping will be done after the plant will shut down. Safety countermeasures were made also.Through use of HSE management,various safety measures were carried out and safety construction was achieved.
Keywords:Revamping of delayed cocking plant  Risk factor  Safety countermeasure