首页 | 本学科首页   官方微博 | 高级检索  
     

金沙江虎跳峡水电站开发建设的战略意义
引用本文:聂勇,于火青,赵增海.金沙江虎跳峡水电站开发建设的战略意义[J].水力发电,2004,30(6):3-5,12.
作者姓名:聂勇  于火青  赵增海
作者单位:中南勘测设计研究院,湖南,长沙,410014
摘    要:虎跳峡水电站是金沙江中下游梯级的龙头电站,该电站的开发建设对金沙江水电梯级开发和“西电东送”的实施具有重要的战略意义;可以大大提高下游梯级电站的电力效益,从根本上改善西南、华中、华南地区的供电质量和可靠性;在滇中调水和长江流域整体防洪规划体系中也占有重要地位。

关 键 词:龙头水库  补偿效益  西电东送  滇中调水  虎跳峡水电站
文章编号:0559-9342(2004)06-0003-03

Strategic significance of development and construction of Hutiaoxia Hydroelectric Project on Jinsha River
Nie Yong,Yu Huo-qing,Zhao Zeng-hai.Strategic significance of development and construction of Hutiaoxia Hydroelectric Project on Jinsha River[J].Water Power,2004,30(6):3-5,12.
Authors:Nie Yong  Yu Huo-qing  Zhao Zeng-hai
Abstract:The Hutiaoxia Hydroelectric Project is a backbone power station of the cascade hydroelectric stations on the middle and lower reaches of the Jinsha River. Its development and construction are of important strategic significance on the cascade development on the Jinsha River and the implementation of power transmission from west to east. It can largely improve the power benefits of the downstream cascade hydroelectric stations, basically improve the quality and reliability of power supply in south-west China, central China and south China, also play an important role in the water diversion system of central Yunnan Province and the integral flood control planning system of the Yangtze River Basin.
Keywords:backbone reservoir  compensation benefit  power transmission from west to east  central yunnan water diversion  Hutiaoxia Hydroelectric Project
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号