预应力锚索施工质量控制探讨
引用本文:栗军奇,周进.预应力锚索施工质量控制探讨[J].水电勘测设计,2006(2):15-18.
作者姓名:栗军奇  周进
作者单位:中国水电工程顾问集团贵阳勘测设计研究院,贵州贵阳550002
摘    要:在四川省紫兰坝水电站预应力锚索施工监理过程中,存在分级预紧、张拉顺序、次锚索回缩大、超张拉等关键工序控制问题,通过监理人员的精心组织和控制、使锚索的施工质量满足了设计要求,可供同行借鉴和参考。

关 键 词:紫兰坝水电站  预应力锚索  质量控制  探讨

prestressed anchorage cable construction
Authors:Li Junqi  Zhou Jin
Abstract:During the process of supervision of prestressed anchorage cable construction of Zilanba hydropower project in Sichuan, there are some key processes which need to be controlled, such as prestressing anchorage cables by different grades, stretching order, big retracting of subordinate anchorage cables, and extra - stretching. Organized and controlled carefully by the supervisors, the construction quality of anchorage cables meets the design requirement and can be for reference for the engineers of the same occupation.
Keywords:Zilanba hydropower project  prestressed anchorage cables  quality control  discussion
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号