首页 | 本学科首页   官方微博 | 高级检索  
     

葛洲坝电站增容改造机组运行稳定性介绍
引用本文:解浩兵,徐华奇. 葛洲坝电站增容改造机组运行稳定性介绍[J]. 大电机技术, 2009, 0(6)
作者姓名:解浩兵  徐华奇
作者单位:葛洲坝水力发电厂,湖北,宜昌,443002
摘    要:介绍了葛洲坝电站125 MW水轮发电机组增容改造的技术措施,通过对3号机组增容改造后的运行稳定性的介绍,说明3号机组增容改造是成功的,为其他机组的增容改造提供依据.

关 键 词:增容改造  机组参数  稳定性

Operation Stability of Gezhouba Hydropower Station after its Capacity Increasing
XIE Hao-bing,XU Hua-qi. Operation Stability of Gezhouba Hydropower Station after its Capacity Increasing[J]. Large Electric Machine and Hydraulic Turbine, 2009, 0(6)
Authors:XIE Hao-bing  XU Hua-qi
Affiliation:XIE Hao-bing,XU Hua-qi(Gezhouba Hydropower Plant,Yichang 443002,China)
Abstract:The technical measures of capacity increasing on the 125 MW hydrogenerator unit of Gezhouba Hydropower Station is introduced.Through introducing the operation stability of unit 3 in Gezhouba hydropower station after its capacity increasing,it has proved that the capacity increasing is successful,and also provided the basis for other units capacity increasing.
Keywords:capacity increasing  unit parameters  stability  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号