积石峡水电站建设过程中的投资控制
引用本文:李积鹏,张小芳,薛伟伟.积石峡水电站建设过程中的投资控制[J].水力发电,2011,37(11).
作者姓名:李积鹏  张小芳  薛伟伟
作者单位:黄河上游水电开发有限责任公司工程建设分公司,青海西宁,810000
摘    要:通过分析项目管理中成本、进度、质量之间的关系,对积石峡水电站设计阶段、招标阶段、施工阶段和竣工结算阶段的造价控制实施了动态管理和监督,保证了量、价、费、合同外增减款项的合理性和真实性。

关 键 词:建设过程  投资控制  积石峡水电站  

Investment Control during the Construction of Jishixia Hydropower Station
Li Jipeng,Zhang Xiaofang,Xue Weiwei.Investment Control during the Construction of Jishixia Hydropower Station[J].Water Power,2011,37(11).
Authors:Li Jipeng  Zhang Xiaofang  Xue Weiwei
Affiliation:Li Jipeng,Zhang Xiaofang,Xue Weiwei(The Engineering Construction Branch Company of Huanghe Hydropower Development Co.,Ltd.,Xining 810000,Qinghai,China)
Abstract:By analyzing the relationships of cost,schedule and quality in project management of Jishixia Hydropower Station,the dynamic management and supervision on pricing control are implemented in the phases of design,bidding,construction and completion and settlement.These controls guarantee the rationality and truthfulness of quantity,price,expenses and the increased or reduced costs not included in contracts.
Keywords:construction process  investment control  Jishixia Hydropower Station  