水电站机电设备重大件运输问题探讨
引用本文:李修树.水电站机电设备重大件运输问题探讨[J].水力发电,2011,37(10).
作者姓名:李修树
作者单位:中国水电工程顾问集团公司,北京,100120
摘    要:针对我国大型水电站分布情况,分析了水电站机电设备重大件的运输问题。详细阐述了水电站水轮机转轮、主变压器、桥机大梁及其他机电设备运输中的难题,并提出了相应的解决措施及建议。

关 键 词:运输  重大件  机电设备  水电站  

Transportation of Heavy and Large Parts for Mechanical and Electrical Equipments of Hydropower Stations
Li Xiushu.Transportation of Heavy and Large Parts for Mechanical and Electrical Equipments of Hydropower Stations[J].Water Power,2011,37(10).
Authors:Li Xiushu
Affiliation:Li Xiushu(HydroChina Corporation,Beijing 100120,China)
Abstract:The distribution of large-scale hydropower stations in China will lead to difficult transportation of heavy and large parts of mechanical and electrical equipment.The problems on transporting turbine runner,main transformer,bridge crane's girder and other mechanical and electrical equipments are analyzed and the solutions and recommendations are also proposed herein.
Keywords:transportation  heavy and large part  mechanical and electrical equipment  hydropower station  