Optimization of Low Phosphorus Steel Production With Double Slag Process in BOF |
| |
Authors: | YANG Xiao SUN Feng-mei YANG Jin-li LIU Fei CHENG Kui-sheng WANG Jian-hua |
| |
Affiliation: | 1. Institute of Research of Iron and Steel(IRIS), Shasteel, Zhangjiagang 215625, Jiangsu, China 2. Hongfa Steelmaking Plant, Shasteel, Zhangjiagang 215625, Jiangsu, China |
| |
Abstract: | To produce the steel with phosphorus less than 0.007% (mass percent), the double slag process has been optimized in basic oxygen furnace (BOF). Dephosphorization and decarburization arc performed in sequence in the same converter. Deslagging is conducted twice, each at the end of dephosphorization and decarburization, by tilting the BOF. Production was tested in a 180 t BOF. Mass percent of phosphorus in steel at BOF blow end has been made to as low as 0.0042% after optimizing operational parameters. Factors affecting dephosphorization performance were studied. Before intermediate deslagging, dephosphorization is determined by the mass transfer of phosphorus from metal/slag interface to bulk slag phase rather than equilibrium thermodynamic conditions. After intermediate deslagging, dephosphorization is determined by the equilibrium thermodynamic conditions such as slag composition and temperature. |
| |
Keywords: | dephosphorization double slag BOF |
本文献已被 万方数据 ScienceDirect 等数据库收录! |
|