珠海发电厂循环水泵房基坑高喷灌浆防渗止水施工
引用本文:张文立. 珠海发电厂循环水泵房基坑高喷灌浆防渗止水施工[J]. 建筑技术, 2002, 33(7): 505-506,515
作者姓名:张文立
作者单位:深圳市力艺市政工程有限公司
摘    要:珠海发电厂循环水泵房工程中,在人工填海块石层上进行防渗处理。由于该地层块石含量多、块大、质硬且受海潮水位涨落影响,施工难度大。针对这一特殊地层,采用高喷灌浆施工工艺,保证了质量,与其他工艺相比,速度快且造价低。

关 键 词:基坑 高喷灌浆 防渗
文章编号:1000-4726(2002)07-0505-03

HIGH-PRESSURE SPINNING GROUTING FOR PUMPING HOUSE FOUNDATION PIT OF ZHUHAI POWER PLANT
ZHANG Wenli. HIGH-PRESSURE SPINNING GROUTING FOR PUMPING HOUSE FOUNDATION PIT OF ZHUHAI POWER PLANT[J]. Architecture Technology, 2002, 33(7): 505-506,515
Authors:ZHANG Wenli
Affiliation:ZHANG Wenli
Abstract:In construction of pumping house of Zhuhai Power Plant,seepage resistance operation was carried out at sea-filled stone course.Because of the great volume,larger size and hardness of the stone as well as influ-enced by tide level,it's very difficult to operate.High-pressure spinning grouting technology was adopted to adapt the special stratum so that construction quality was secured.Comparing with other technology this method was of both expedition and cost-effectiveness.
Keywords:foundation pit  high-pressure spinning grouting  seepage resistance