首页 | 本学科首页   官方微博 | 高级检索  
     

小湾水电站地下厂房吊车梁设计
引用本文:洪振伟.小湾水电站地下厂房吊车梁设计[J].云南水力发电,1996(1):71-75.
作者姓名:洪振伟
作者单位:电力部昆明勘测设计研究院
摘    要:小湾水电站地下厂房跨度大,吊车吨位大,在国内首屈一指.本文对吊车梁型式:岩壁式、岩台式作了详细的计算、分析、论证,最后确定采用吊车梁型式.

关 键 词:小湾水电站,岩壁吊车梁,岩台吊车梁,岩壁稳定

Design of Crane Beam in the Underground Powerhouse of Xiaowan Hydropower Station
Hong Zhenwei.Design of Crane Beam in the Underground Powerhouse of Xiaowan Hydropower Station[J].Yunnan Water Power,1996(1):71-75.
Authors:Hong Zhenwei
Abstract:Xiaowan Hydropower Station is particular to its underground powerhoue with long span and heavy crane,they come first on the list nationwide. This paper deals with the caculation,analysis, and verification of crane beams including two types of rock-panel and rock-bench,type of crane beam is determined at last.
Keywords:Xiaowan Hydropower Station  crane beam of type rock-panel  crane beam of type rock-bench  stability of rock  