首页 | 本学科首页   官方微博 | 高级检索  
     

宝泉抽水蓄能电站设计中的几个重大技术问题
引用本文:景来红,汪雪英,陈汉文.宝泉抽水蓄能电站设计中的几个重大技术问题[J].水力发电,1999(4):24-28.
作者姓名:景来红  汪雪英  陈汉文
作者单位:水利部黄河水利委员会勘测规划设计研究院,郑州,450003
摘    要:河南宝泉抽水蓄能电站装机4*300MW,年发电量20.10kW.h。年抽水耗电量26.42亿kW.h,综合效率0.76,在设计中遇到了几个重大技术问题并采取了要应措施,主要有:上库渗漏量较大,库底防渗采用局部开挖覆盖层,回填石渣粘土铺盖防渗,库岸用沥青混凝土防渗;

关 键 词:水电站设计  防渗设计  输水洞衬砌  抽水蓄能电站
修稿时间:1999-01-11

Several key technical problems in the design of Baoquan Pumped-storage Power Plant
Jing Laihong,Wang Xueying,Chen Hanwen.Several key technical problems in the design of Baoquan Pumped-storage Power Plant[J].Water Power,1999(4):24-28.
Authors:Jing Laihong  Wang Xueying  Chen Hanwen
Abstract:The Baoquan Pumped storage Power Plant has the installed capacity of 4 300 MW, the annual energy output of 2 010 TWh, the annual water pumped energy consumption of 2.642 TWh and the comprehensive efficiency of 0.76. In the design of the plant, the following several key technical problems have been solved. Due to the large seepage volume of the upper reservoir, the local overburden layer in the bottom of the reservoir has been excavated and backfilled by quarry rubbish and clay as blanket to control seepage. The asphalt concrete has been used in the bank seepage control of the upper reservoir. Because the original dam of the lower reservoir has been heightened and strengthened, the reinforced concrete face slab has been adopted for seepage control, which solves the problem of underwater construction. Due to different rock properties in different sections of the water conveyance tunnel, manifold lining types have been adopted. The rated speed of the generating unit of 428.6 r/min is selected.
Keywords:pumped  storage power plant  design of hydropower station  design of seepage control  lower reservoir capacity expansion  water conveyance tunnel lining  selection of generating unit speed  Baoquan Pumped  storage Power Plant
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号