首页 | 本学科首页   官方微博 | 高级检索  
     

2 500 t/d生产线节能减排实践探索
引用本文:曾廷祥. 2 500 t/d生产线节能减排实践探索[J]. 水泥工程, 2023, 36(5): 41-43
作者姓名:曾廷祥
作者单位:陇南祁连山水泥有限公司
摘    要:陇南祁连山水泥有限公司2 500 t/d熟料生产线存在煤电消耗偏高,预热器系统阻力高、出口废气温度高等问题。对此公司采取了一系列节能改造措施:优化高温风机,优化一级筒,预热器扩容,优化篦冷机篦床等,效果较显著,水泥窑运行热工得到稳定,熟料质量创公司历史最好水平,实现了节能降耗的预期目标。

关 键 词:节能减排  高温风机  预热器  篦冷机

Exploration of energy-saving and emission reduction practices for a 2500 t/d production line
Abstract:The 2500 t/d clinker production line of Longnan Qilianshan Cement Co., Ltd. has problems with high coal electricity consumption, high resistance of the preheater system, and high outlet exhaust gas temperature. The company has taken a series of energy-saving transformation measures, including optimizing high-temperature fans, optimizing primary cylinders, expanding preheaters, and optimizing the grate bed of the grate cooler. The results have been significant, and the thermal stability of cement kiln operation has been achieved. The quality of clinker has reached the best level in the company''s history, achieving the expected goal of energy conservation and consumption reduction.
Keywords:energy-saving and emission reduction  high temperature fans  preheater  grate cooler
点击此处可从《水泥工程》浏览原始摘要信息
点击此处可从《水泥工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号