首页 | 本学科首页   官方微博 | 高级检索  
     


Demolition Technique of High Thin-wall Hyperbolic Reinforced Concrete Cool Tower by Directional Controlled Blasting
Authors:Luo Yong
Affiliation:Postdoctoral Programme,Huainan Mining Group Co.,Ltd.
Abstract:Based on blasting demolition of high thin-wall hyperbolic reinforced concrete cool tower, by virtue of engineering practice of blasting the tube concrete structures, the analysis and research were made on the mechanism of cool tower collapse through selecting blasting parameters and selecting gap form, gap size and gap angle. The cool tower was twisted, collapsed directionally and broken well according to the design requirements. The expected results and purposes of blasting were obtained with no back-blow, total blasted pile approximates to 4~5m height, no occurrence of flying stones and no damage to fixed buildings and equipments, the large-sized hyperbolic thin-wall reinforced concrete cool towers are twisted during blasting and it collapses well with good breaking. The test and measurement of blasting vibrating velocity was carried out during blasting and the measuring results are much less than critical values specified by safety regulations for blasting. The study shows that gap form, gap size and gap angle are the key factors to cool tower collapse and will give beneficial references to related theoretical study and field application.
Keywords:cool tower   blasting demolition   directional blasting   gap
点击此处可从《中国工程科学》浏览原始摘要信息
点击此处可从《中国工程科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号