首页 | 本学科首页   官方微博 | 高级检索  
     

人工挖孔桩基施工中流砂通泥原因与处理
引用本文:李玉富. 人工挖孔桩基施工中流砂通泥原因与处理[J]. 福建建筑, 1997, 0(4): 27-29
作者姓名:李玉富
作者单位:福建省五建公司总工室!362000
摘    要:本文主要从岩土的三方面物质成份,地下水动力特征及人为扰动因素,分析引起人工挖孔桩施工中涌泥流砂的原因,并从现场施工实践中总结几种处理措施。

关 键 词:流砂  涌泥  机械潜蚀作用  水力坡度  渗透系数

The Causes and Treatment of Construction of Sandy soil Flowing in the Construction of Manual Excavated Pile
Li Yufu. The Causes and Treatment of Construction of Sandy soil Flowing in the Construction of Manual Excavated Pile[J]. Fujian Architecture & Construction, 1997, 0(4): 27-29
Authors:Li Yufu
Affiliation:Fujian Fifth Architectural Company 362000
Abstract:The artical analyses and studies the causes of sandy soil flowing in the construction of manual excavated pile in three ways: sandy soil compesition, hydrodymamic characteristic of subusrface water and manual disturbed factors, summarizes some handling measures from engineering practices.
Keywords:flowsand   flowsoil   mechanical suberoded function hydraulic gradient  permeable factor
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号