首页 | 本学科首页   官方微博 | 高级检索  
     

三门峡水电站6号机扩装工程简介
引用本文:张金良. 三门峡水电站6号机扩装工程简介[J]. 人民黄河, 1995, 0(9): 4-6
作者姓名:张金良
作者单位:三门峡水利枢纽管理局
摘    要:三门峡水电站6号机扩装工程自1991年4月开工至1994年4月试运行结束,历时3年。此次扩建的主要原因是电站原装机容量偏小,河南省电网缺少相应的调峰机组,现有机组运行工况差等。本文简要介绍了该工程的设计与施工情况,主要内容有:主要技术经济指标,进水口、厂房,尾水以及升压变配电及中控室改造工程等。

关 键 词:三门峡水电站 水轮发电机组 设计 安装 扩建

Brief Introduction of Sixth Generating Unit Extension in Sanmen Gorge Hydropower Station
Zhang Jinliang. Brief Introduction of Sixth Generating Unit Extension in Sanmen Gorge Hydropower Station[J]. Yellow River, 1995, 0(9): 4-6
Authors:Zhang Jinliang
Abstract:ixth generating unit extension of Sanmen Gorge Hydropower Station began in April 1991and completed test operation in April 1994. The major reasons for making the project are as follows: the original installed capacity was comparatively too small, there are lack of correspondingpeak modulation set in Henan eletrified wire netting, and the existing generating units are operated unwell. This paper introduces briefly the design and construction of the extension project, inwhich the main contents includes. water intake improvement, factory building, tail water. step-uptransformation and distribution, and central control house amelioration. and so on.
Keywords:construction   design. extension. sixth generating unit   Sanmen Gorge HydropowerStation
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号