首页 | 本学科首页   官方微博 | 高级检索  
     


Schedule control model for linear projects based on linear scheduling method and constraint programming
Affiliation:1. State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, No. 3 of Shangyuan Residence, Haidian District, Beijing, 100044, PR China;2. MOE Key Laboratory for Urban Transportation Complex Systems Theory, Beijing Jiaotong University, No. 3 of Shangyuan Residence, Haidian District, Beijing, 100044, PR China;1. Department of Architecture and Civil Engineering, City University of Hong Kong, Kowloon, Hong Kong;2. Department of Architecture, University of Cambridge, Cambridge, United Kingdom;3. Center for Integrated Facility Engineering, Department of Civil and Environmental Engineering, Stanford University, Stanford, CA 94305, USA;1. Construction Engineering and Management Program, Department of Civil Engineering, Catholic University of America, 620 Michigan Avenue NE, Washington, DC 20064, United States;2. Faculty of Engineering, Cairo University, Giza, Egypt;3. Department of Civil Engineering, 500 El Camino Real, Santa Clara University, Santa Clara, CA 95053, United States;4. Department of Mathematics, Campus Saint Jean, University of Alberta, 8406 Marie-Anne-Gaboury Street (91st Street), Edmonton, Alberta T6C 4G9, Canada;1. Department of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran;2. Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran;1. SILC Business School, Shanghai University, 20 Chengzhong Rd., Jiading, Shanghai 201800, China;2. Department of Building and Real Estate, Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong;3. School of Management, Huazhong University of Science and Technology, Wuhan 430074, China;4. School of Civil Engineering and Built Environment, Science and Engineering Faculty, Queensland University of Technology, Brisbane, QLD, Australia
Abstract:China Railway is undertaking massive construction and development projects.A reasonable and resource-leveled schedule that allows for adjustments for unforeseen circumstances during construction is critical for managing railway construction projects. Currently, most construction projects use traditional network planning methods or the Gantt schedule for project management. However, these methods have limited applicability to railway construction projects, which are typically linear. This study uses the linear scheduling method and constraint programming techniques for solving schedule control problems faced during railroad construction. The proposal comprises a schedule control model, scheduling model, and schedule control system; the scheduling model is central to the schedule control model. Characteristics such as high flexibility and practicality facilitate multi-objective optimization during scheduling and modification of the linear schedule. The proposed model and algorithm were validated by comparing results with actual data from a highway construction project and the Urumqi–Dzungaria railway construction project.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号