鱼梁航运枢纽施工设计洪水分析研究
引用本文:龙四立.鱼梁航运枢纽施工设计洪水分析研究[J].广西水利水电,2010(6):31-34,37.
作者姓名:龙四立
作者单位:广西水利电力勘测设计研究院,广西南宁530023
摘    要:鱼梁航运枢纽是郁江综合利用规划的第5个梯级,坝址上游已建的水利工程有百色水利枢纽和那吉航运枢纽。施工洪水计算了3种工况:①天然情况;②百色水库单独影响;③百色水库、那吉水库共同影响。通过对施工设计洪水进行优化,提出了降低施工成本、保障施工安全的设计洪水成果。

关 键 词:施工期设计洪水  百色水利枢纽  那吉航运枢纽  鱼梁航运枢纽  优化设计

Study of construction design flood for Yuliang Navigation Complex
LONG Si-li.Study of construction design flood for Yuliang Navigation Complex[J].Gx Water Resources & Hydropower Engineering,2010(6):31-34,37.
Authors:LONG Si-li
Affiliation:LONG Si-li (Guangxi Water and Power Design Institute,Nanning 530023,China)
Abstract:Yuliang Navigation Complex is the 5th cascade of Yujiang River Comprehensive Utilization Plan.Upstream Baise Multipurpose Dam Project and Naji Navigation Complex had been constructed.Three operating conditions were taken into account for construction flood calculation,including natural conditions;with independent impact of Baise reservoir;with combined effect of Baise reservoir and Naji reservoir.Through optimization,the construction design flood data was provided to reduce construction cost and ensure construction safety.
Keywords:Construction design flood  Baise Multipurpose Dam Project  Naji Navigation Complex  Yuliang Navigation Complex  optimization design