首页 | 本学科首页   官方微博 | 高级检索  
     

广东奥林匹克体育场预应力混凝土管桩作为抗拔桩的设计研究
引用本文:韦宏,舒宣武.广东奥林匹克体育场预应力混凝土管桩作为抗拔桩的设计研究[J].建筑结构,2001(5).
作者姓名:韦宏  舒宣武
作者单位:华南理工大学建筑设计研究院!广州510641
摘    要:首次将预应力混凝土管桩作为抗拔桩应用在广东奥林匹克体育场地下室抗浮设计中。对预应力管桩的抗拔性能进行分析计算及现场拉拔试验 ,对桩型、端板和混凝土的选择提出一些合理化设计建议

关 键 词:预应力混凝土管桩  抗浮  抗拔

Test and Design of Prestressed Concrete Pile as Resistant Extraction Pile in Guangdong Olympic Gym Center
Wei Hong,Shu Xuanwu.Test and Design of Prestressed Concrete Pile as Resistant Extraction Pile in Guangdong Olympic Gym Center[J].Building Structure,2001(5).
Authors:Wei Hong  Shu Xuanwu
Affiliation:Wei Hong Shu Xuanwu
Abstract:In the basement construction of the Guangdong Olympic Gym Center,the prestressed concrete pile is adopted as resistant extraction pile to resist buoyancy the first time.The analysis of this kind of structure with test in site is formulated.Some suggestions for selection of the type,end plate and concrete of pile are proposed.
Keywords:prestressed concrete pile  resistant extraction  resistant buoyancy
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号