首页 | 本学科首页   官方微博 | 高级检索  
     

新疆“500”水库取水方案选择
引用本文:马军.新疆“500”水库取水方案选择[J].广西水利水电,2011(5):57-58,65.
作者姓名:马军
作者单位:新疆水利水电勘测设计研究院,新疆乌鲁木齐,830000
摘    要:针对新疆寒冷地区的特点,结合“500”水库实际情况,对泵船、长轴泵及斜拉式潜水泵等3个取水方案进行比选,最终选定斜拉式潜水泵取水方案.实施后,经3个冬季运行检验,证明该方案简单、可靠,效果好.

关 键 词:寒冷地区  水库  取水  方案  选择

Water taking scheme selection for 500 reservoir of Xinjiang
MA Jun.Water taking scheme selection for 500 reservoir of Xinjiang[J].Gx Water Resources & Hydropower Engineering,2011(5):57-58,65.
Authors:MA Jun
Affiliation:MA Jun (Xinjiang Water and Power Investigation Design & Research Institute,Urumchi 830000,China)
Abstract:Xinjiang Uigur Autonomous Region is located in cold area.Taking into account the weather characteristics,according to the actual condition of 500 reservoir,inclined stayed submersible pump scheme was selected after comparison with pump boat and long-shaft pump.Three years of operation demonstrate the determined scheme is simple and reliable with good effects.
Keywords:Cold area  reservoir  water take  scheme  select
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号