首页 | 本学科首页   官方微博 | 高级检索  
     

白鹤滩水库回水支流的鱼类 栖息地模拟评估
引用本文:孙嘉宁,张土乔,DavidZ.Zhu,傅菁菁.白鹤滩水库回水支流的鱼类 栖息地模拟评估[J].水利水电技术,2013,44(10):17.
作者姓名:孙嘉宁  张土乔  DavidZ.Zhu  傅菁菁
作者单位:(1.浙江大学建筑工程学院市政工程研究所,浙江杭州310058; 2. 加拿大阿尔伯特大学土木与环境工程系,加拿大阿尔伯塔埃德蒙顿T6G2W2; 3.中国水电顾问集团华东勘测设计研究院,浙江杭州310014)
摘    要:基于河道内流量增加法(IFIM),采用River2D对白鹤滩水库回水支流黑水河进行水动力模拟和鱼类栖息地模拟,根据加权可利用面积(WUA)分析蓄水前后鱼类适宜物理栖息地的数量变化和质量变化。结果显示:蓄水后,按蓄水水位不同,适宜栖息地总面积仅为自然状况下的0.8%~25.3%,且呈边缘化分布。根据水库调度运行方案,蓄水后春夏季节栖息地总量将高于秋冬季节,与蓄水前情况相反。

关 键 词:鱼类生境  回水区  河道内流量增加法  水动力学模拟  物理栖息地模拟  白鹤滩水库  
收稿时间:2012-10-15

Simulative evaluation of fish habitat of backwater tributary of Baihetan Reservoir
SUN Jianing,ZHANG Tuqiao,DavidZ.Zhu,FU Jingjing.Simulative evaluation of fish habitat of backwater tributary of Baihetan Reservoir[J].Water Resources and Hydropower Engineering,2013,44(10):17.
Authors:SUN Jianing  ZHANG Tuqiao  DavidZZhu  FU Jingjing
Affiliation:(1.College of Civil Engineering and Architecture, Zhejiang University, Hangzhou310058, Zhejiang, China; 2. Department of Civil and Environmental Engineering, University of Alberta, Edmonton, AB, T6G 2W2, Canada; 3. Hydrochina Huadong Engineering Corporation, Hangzhou310014, Zhejiang, China)
Abstract:Based on the Instream Flow Incremental Methodology(IFIM), the hydrodynamic simulation and fish habitat simulation are made for the backwater tributary of Baihetan Reservoir by the program of River2D, and then both the quantity change and quality change of the physical habitats therein before and after impoundment of the reservoir are analyzed in accordance with the weighted usable area(WUA). The result shows that after the impoundment, the total area of the suitable habitat is only 0.8%~25.3% of that under the natural condition and even shows a marginalized distribution according to the difference of the impoundment level. On the basis of the reservoir operation scheme, the total amount of habitats therein within the seasons of spring and summer is to be larger than that within the autumn and winter seasons after the impoundment, which is opposite against that before the impoundment.
Keywords:fish habitat  backwater region  Instream Flow Incremental Methodology(IFIM)  hydrodynamic simulation  physical habitat simulation  Baihetan Reservoir  
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号