首页 | 本学科首页   官方微博 | 高级检索  
     

武钢新3号高炉无料钟炉顶控制技术
引用本文:孙平. 武钢新3号高炉无料钟炉顶控制技术[J]. 冶金自动化, 1994, 18(3): 9-12,18
作者姓名:孙平
作者单位:武钢炼铁厂
摘    要:本文介绍了武钢新3号高炉的无料钟炉顶控制技术,它包括无料钟联锁控制方法,原料准备与无料钟布料的矩阵,二级计算机系统的组成,并着重介绍了布料料流检测方法和多环布料控制方法。

关 键 词:高炉 无料钟炉顶 计算机控制

Control techniques for bell-less top in the new No. 3 BF of WISCO
Sun Ping. Control techniques for bell-less top in the new No. 3 BF of WISCO[J]. Metallurgical Industry Automation, 1994, 18(3): 9-12,18
Authors:Sun Ping
Abstract:The new No. 3 BF of WISCO is a newbuilt , large scale and modernized blast furnace. The advanced control techniques for its bell-less top are: the interlocking control method , the matrixes linking burden preparation and bell-less top, the configuration of computer control system of two-levels, the key detecting and controlling models for material flow, and the control method of multiple-ring stock distribution.
Keywords:blast furnace  bell-less top  computer system  matrix  multiple-ring stock distribution  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号