首页 | 本学科首页   官方微博 | 高级检索  
     

发电厂高压厂用电中性点电阻接地方式浅析
引用本文:唐顺志. 发电厂高压厂用电中性点电阻接地方式浅析[J]. 重庆电力高等专科学校学报, 2006, 11(1): 15-18
作者姓名:唐顺志
作者单位:重庆电力高等专科学校电力工程系,重庆,400053
摘    要:简要介绍国内高压厂用电中性点电阻接地方式发展,列举传统方式的缺点,提出中性点中电阻接地方式的观点。

关 键 词:发电厂  厂用中性点方式  中电阻接地
文章编号:1008-8032(2006)01-0015-04
收稿时间:2005-04-12
修稿时间:2005-04-12

Analysis of Neutral Grounding for High-voltage House Service System in Power Plant
TANG Shun-zhi. Analysis of Neutral Grounding for High-voltage House Service System in Power Plant[J]. Journal of Chongqing Electric Power College, 2006, 11(1): 15-18
Authors:TANG Shun-zhi
Affiliation:Electric Engineering Department of Chongqing Electric Powe, Chongqing 400053
Abstract:The paper introduces the domestic development of neutral grounding by resistance for high- voltage house service system, enumerates the disadvantage of transitional mode, brings forward the view of neutral grounding by resistance.
Keywords:power plant  high-voltage house service system  neutral grounding mode  resistance grounding
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号