首页 | 本学科首页   官方微博 | 高级检索  
     

快速掘进超前临时支护支架选型
引用本文:吕怀宝. 快速掘进超前临时支护支架选型[J]. 煤矿机电, 2019, 0(4): 114-115,118
作者姓名:吕怀宝
作者单位:陕西陕煤黄陵矿业有限公司
摘    要:以黄陵矿业有限公司一号煤矿807进风顺槽为工程背景,通过理论分析和计算,确定掘进工作面端头支护强度为37.71kPa,结合实际掘进地质条件,确定采用ZL2×1800/24/32型超前临时支护支架组进行临时支护。经实际应用表明,该临时支护方案在保证安全的基础上提高了掘进速度,具有良好的应用效果。

关 键 词:掘进工作面  临时支护  液压支架  选型

Type Selection of Advanced Temporary Support in Rapid Tunneling Face
Affiliation:(Shaanxi Coal Group Huangling Mining Co., Ltd., Yan’an 727307, China)
Abstract:Based on the engineering background of No.1 Coal Mine of Huangling Mining Co., Ltd. 807 air intake chute, through theoretical analysis and calculation, the support strength at the end of heading face has been determined to be 37.71 kPa. Combining with the actual geological conditions of heading, the temporary support group of ZL2×1800/24/32 type advance temporary support has been adopted for temporary support. Through practical application, the temporary support can improve the driving speed on the basis of ensuring safety, and has good application effect.
Keywords:tunnelling face  temporary support  hydraulic support  type selection