小关子电站地下厂房洞室开挖技术
引用本文:陈为明,徐成光. 小关子电站地下厂房洞室开挖技术[J]. 广西水利水电, 2000, 0(4): 11-15
作者姓名:陈为明  徐成光
作者单位:中国水电七局施工技术处,四川,郫县,611730
摘    要:根据小关子电站地下厂房开挖的六大特点 ,精心制定施工技术措施 ,严格施工管理 ,在安全、优质的基础上 ,开挖工期比原计划提前 75天 ,真正达到了快速施工的目的。

关 键 词:小关子电站  地下厂房  开挖工程  快速施工技术

The cavern excavating technique of the Xiaoguanzi hydropower station''''s underground power house
CHEN Wei-ming,XU Cheng-guang. The cavern excavating technique of the Xiaoguanzi hydropower station''''s underground power house[J]. Gx Water Resources & Hydropower Engineering, 2000, 0(4): 11-15
Authors:CHEN Wei-ming  XU Cheng-guang
Abstract:According to the six features of the Xiaoguanzi hydropower station's underground power house excavating, the construction technique countermeasures were elaborated and on strict construction management, based on safety and excellent quality, the excavating term was completed beforehand 75 days than the plan and realized the rapid construction aim.
Keywords:the Xiaoguanzi hydropower station  underground power house  excavating engineering  quick construction technique