首页 | 本学科首页   官方微博 | 高级检索  
     

HPE工法在杭州地铁武林广场站施工中的应用
引用本文:刘新管.HPE工法在杭州地铁武林广场站施工中的应用[J].山西建筑,2012,38(5):109-111.
作者姓名:刘新管
作者单位:中铁三局集团有限公司,山西太原,030001
摘    要:简要分析了某地铁车站工程的特点以及施工重点和难点,详细介绍了HPE液压垂直插入工法在地铁车站施工中的应用,并给出新的技术对策,解决了钢管柱安装工艺落后的问题,为施工安全提供了保障。

关 键 词:地铁车站  盖挖逆作法  HPE工法  垂直度

Application of HPE construction method in the construction of Hangzhou Wulin square subway station
LIU Xin-guan.Application of HPE construction method in the construction of Hangzhou Wulin square subway station[J].Shanxi Architecture,2012,38(5):109-111.
Authors:LIU Xin-guan
Affiliation:LIU Xin-guan
Abstract:This thesis briefly analyzes the features,construction points,and difficulties of the subway station engineering,specifically introduces the application of HPE hydraulic vertical insertion method in the subway station construction,and shows new technological countermeasures,which has solved the problem of backward installation technique of steel pipe column and has provided guarantee for construction security.
Keywords:subway station  cover and cut-top down  HPE construction method  verticality
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号