固定总价招投标项目工程量漏项清单处理方法
引用本文:徐斌. 固定总价招投标项目工程量漏项清单处理方法[J]. 山西建筑, 2012, 38(4): 258-259
作者姓名:徐斌
作者单位:武汉桥建集团有限公司,湖北武汉,430015
摘    要:着重讨论了固定总价招投标项目工程量漏项清单的处理方法,就漏项问题产生的原因、漏项问题在招标阶段、施工过程、竣工结算中的处理以及清单计价风险责任的承担进行了详细的阐述和分析,并对各个阶段提出了应对处理方法,对避免工程量漏项清单的发生和提高工程量漏项清单的准确性有着积极的意义。

关 键 词:固定总价合同  工程量清单  漏项

Detailed list of engineering quantity leakage processing methods of fixed price bidding project
XU Bin. Detailed list of engineering quantity leakage processing methods of fixed price bidding project[J]. Shanxi Architecture, 2012, 38(4): 258-259
Authors:XU Bin
Abstract:This paper emphatically discussed the detailed list of engineering quantity leakage processing methods of fixed price bidding project, made detailed elaboration and analysis on causes of leakage problems, the treatment of leakage problems in the bidding phase, construction process, final settlement and the undertook responsibility of detailed list of risk liability, put forward response processing methods to each stage, had a positive meaning to avoid the happen of detailed list of engineering quantity leakage and improve the accuracy of detailed list of engineering quantity leakage.
Keywords:fixed conclude contract   detailed list of engineering quantity   leakage