首页 | 本学科首页   官方微博 | 高级检索  
     

朔州环城高速恢河2号大桥箱梁预制施工工艺
引用本文:纪凤兰.朔州环城高速恢河2号大桥箱梁预制施工工艺[J].山西建筑,2012,38(7):185-186.
作者姓名:纪凤兰
作者单位:朔州路桥建设有限责任公司,山西朔州,036002
摘    要:针对朔州环城高速恢河2号大桥箱梁预制施工工艺进行了详细介绍,按照施工工艺流程,分别阐述了各分部工序施工要点及注意事项,以确保预制箱梁的质量,对今后同类工程有指导意义。

关 键 词:箱梁预制  施工工艺  注意事项

Prefabricating construction technology of Huihe Bridge No. 2 box girder on Shuozhou city highway
JI Feng-lan.Prefabricating construction technology of Huihe Bridge No. 2 box girder on Shuozhou city highway[J].Shanxi Architecture,2012,38(7):185-186.
Authors:JI Feng-lan
Affiliation:JI Feng-lan
Abstract:This paper introduces the prefabricating construction technology of Huihe Bridge No. 2 box girder on Shuozhou city highway in detail, and respectively illustrates divisional construction points and matters needing attention according to construction technology and procedure in order to ensure the quality of prefabricated box girder, which has guiding meaning for similar project in future.
Keywords:box girder prefabrication  construction technology  matters needing attention
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号