首页 | 本学科首页   官方微博 | 高级检索  
     

新原路后张法预应力混凝土连续箱梁预制工艺
引用本文:罗建国. 新原路后张法预应力混凝土连续箱梁预制工艺[J]. 山西建筑, 2002, 28(7): 53-54
作者姓名:罗建国
作者单位:山西新原高速公路建设有限公司
摘    要:介绍了新原高速公路跨越京原铁路分离式立交桥的工程概况,主要阐述了后张法预应力混凝土连续箱梁的预制工艺过程,从预制场台座,模板,钢筋,预应力孔道,混凝土施工到钢绞线张拉和压浆等每道工序均作了详细说明。

关 键 词:预应力混凝土 连续箱梁 预制工艺 后张法
文章编号:1009-6825(2002)07-0053-02

Prefabricated technology of post-stressed concrete continuous box beam
LUO Jian-guo. Prefabricated technology of post-stressed concrete continuous box beam[J]. Shanxi Architecture, 2002, 28(7): 53-54
Authors:LUO Jian-guo
Abstract:In this paper the engineering situation of superbridge in Xin-Yuan express highway over crossing Jing-Yuan railway is introduced. The prefabricated technology of post-stressed concrete continuous box beam is mainly elaborated. Each working operation is illustrated in detail from construction, mould, reinforced bar, concrete, prestressed hole and other aspects.
Keywords:post-tensioning method   prestressed continuous box beam   prefabricated technology   construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号