首页 | 本学科首页   官方微博 | 高级检索  
     

哈三电厂二期工程600 MW机组轴系安装
引用本文:刘文庆,刘文涛. 哈三电厂二期工程600 MW机组轴系安装[J]. 湖北电力, 2004, 28(1): 47-49
作者姓名:刘文庆  刘文涛
作者单位:黑龙江省火电第三工程公司,哈尔滨,150024;大庆石油管理局龙凤热电厂,大庆,163711
摘    要:总结了国产首台600MW汽轮发电机组轴承安装的经验,介绍了低压转子定位方法,对厂家低压对轮找中心设计值提出了修正意见。可为国产600MW机组的安装调试提供参考。

关 键 词:600 MW汽轮发电机组  轴系安装  转子定位
文章编号:1006-3986(2004)01-0047-03
修稿时间:2003-09-21

Installation of Axial System for 600 MW Generating Set at Harbin No.3 Power Plant
LIU Wen-qing,LIU Wen-tao. Installation of Axial System for 600 MW Generating Set at Harbin No.3 Power Plant[J]. Hubei Electric Power, 2004, 28(1): 47-49
Authors:LIU Wen-qing  LIU Wen-tao
Affiliation:LIU Wen-qing~1,LIU Wen-tao~2
Abstract:The experience gained from the installation of the China-made first 600 MW generating set is summarized and the fixation of low-pressure rotor is introduced. The comment of revising the factory-designed value for centering the low-pressure rotor is put forward and it may be useful for reference to install the China-made 600 MW generating set.
Keywords:600 MW generating set  axial system installation  position fixing for rotor  