首页 | 本学科首页   官方微博 | 高级检索  
     

矿柱稳定性影响因素敏感性正交极差分析
引用本文:尹升华,吴爱祥,李希雯.矿柱稳定性影响因素敏感性正交极差分析[J].煤炭学报,2012,37(Z1):48-52.
作者姓名:尹升华  吴爱祥  李希雯
作者单位:1.北京科技大学 金属矿山高效开采与安全教育部重点实验室,北京 100083;; 2.北京科技大学 土木与环境工程学院,北京 100083
基金项目:国家自然科学基金资助项目(50934002,51104011);高等学校博士学科点基金资助项目(2011000612002)
摘    要:基于正交极差分析方法对矿柱稳定性影响因素敏感性进行了评价。在分析矿柱荷载、强度、失稳势函数、破坏形式的基础上,总结了影响矿柱稳定性的主要因素;针对矩形矿柱8个主要影响因素:采深、矿房宽度、矿柱宽度、矿柱高度、矿体的单轴抗压强度、上覆岩层的容重、矿柱长度、矿柱长度方向的间距,建立了计算矩形矿柱安全系数的简化公式。以江西某钨矿为例,采用正交极差分析理论,得到该矿矿柱稳定性影响因素的主次顺序为:矿房宽度>矿柱宽度>采深>矿柱高度>矿体的单轴抗压强度>上覆岩层容重,即矿房宽度、矿柱宽度对矿柱稳定性的影响最为显著,并得到了矿房宽度、矿柱宽度与矿柱安全系数间的关系曲线,对采场结构参数进行了优化,矿房宽度值小于21.03 m,矿柱宽度值大于3.718 m。

关 键 词:矿柱  稳定性  影响因素  敏感性  正交极差  
收稿时间:2010-10-27

Orthogonal polar difference analysis for sensitivity of the factors influencing the ore pillar stability
YIN Sheng-hua,WU Ai-xiang,LI Xi-wen.Orthogonal polar difference analysis for sensitivity of the factors influencing the ore pillar stability[J].Journal of China Coal Society,2012,37(Z1):48-52.
Authors:YIN Sheng-hua  WU Ai-xiang  LI Xi-wen
Affiliation:1(1.Key Laboratory of High-Efficient Mining and Safety of Metal,Ministry of Education,University of Science and Technology Beijing,Beijing 100083,China;2.School of Civil and Environment Engineering,University of Science and Technology Beijing,Beijing 100083,China)
Abstract:Based on the orthogonal polar difference,sensitivity of the factors influencing the ore pillar stability was evaluated.Ore pillar load,strength,instability potential function,deformation model were analyzed.The main factors influencing ore pillar stability was put forward.A simplified formula was established to calculate the rectangle ore pillar safety parameter by considering the factors of mining depth,room width,ore pillar width,ore pillar height,uniaxial compressive strength of the ore,weight of the surrounding rock,ore pillar length and interval between pillars along the length direction.Orthogonal polar difference analysis theory was selected to investigate the factors influencing the ore pillar stability in a tungsten mine in Jiangxi Province.The sequence of the factors is listed from the most to least:room width,ore pillar width,mining depth,ore pillar height,ore strength and rock weight.It means that ore pillar stability is seriously influenced by room width and ore pillar,and the relationship curves is obtained.The mining parameters were optimized based on the analysis result.The room width should be less than 21.03 m,while the pillar width should be larger than 3.718 m.
Keywords:ore pillar  stability  influencing factor  sensitivity  orthogonal polar difference
本文献已被 CNKI 等数据库收录!
点击此处可从《煤炭学报》浏览原始摘要信息
点击此处可从《煤炭学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号