无底柱分段分条连续采矿法回采碎裂矿体的实践
引用本文:苏家红,陈庆发.无底柱分段分条连续采矿法回采碎裂矿体的实践[J].化工矿物与加工,2012(10):29-32.
作者姓名:苏家红  陈庆发
作者单位:广西华锡集团股份有限公司;广西大学资源与冶金学院
基金项目:中国博士后科学基金(20110491273);广西自然科学基金(2011GXNSFB018011);河池市科学研究与技术开发计划项目(河科攻117101-008);广西教育厅科研项目(200911MS01);广西大学科研基金资助项目(XBZ100126)
摘    要:针对广西高峰矿105号矿体高价值碎裂资源的开采技术条件,开发出一种新采矿方法,即无底柱分段分条连续采矿法,该方法根据矿体厚度的不同,采用多种矿块结构形式。在工艺上,先用分段空场法回采间柱,胶结充填后形成人工矿柱;矿房回采后,先在矿房底部进行高配比的胶结充填,其余空间采用低配比水泥砂浆充填或块石充填。生产实践表明该方法作业安全性好,生产能力高,贫化损失率低,适合于高价值破碎矿体的回采。

关 键 词:无底柱分段分条连续采矿法  高价值碎裂资源  分段空场法

Application of a new non-pillar sublevel striping continuous mining method in the mining cataclastic orebody
SU Jia-hong,CHEN Qing-fa.Application of a new non-pillar sublevel striping continuous mining method in the mining cataclastic orebody[J].Industrial Minerals and Processing,2012(10):29-32.
Authors:SU Jia-hong  CHEN Qing-fa
Affiliation:2(Guangxi China Tin Group Co.Ltd, Liuzhou Guangxi 545006,China; College of Resources and Metallurgy, Guangxi University, Nanning Guangxi 530004,China)
Abstract:Through analyzing the mining technology conditions of the cataclastic ore section with high value of the orebody No.105 in Guangxi Gaofeng Mine,a new non-pillar sublevel striping continuous mining method was suggested.In this method,the block structure has various forms according to the orebody’s different thickness;ore pillars were stoped out by sublevel open stope method and filled with high molar ratio cemented filling prior to the adjacent chambers being stoped out and filled with local cemented filling and most low molar ratio cement mortar or waste rocks.The production practice showed safety in operation,high productivity,lower ore dilution and loss ratio with this method,which is suitable for mining the cataclastic resources with high value.
Keywords:mining method  non-pillar sublevel striping continuous mining method  cataclastic ore section  sublevel open stope method