首页 | 本学科首页   官方微博 | 高级检索  
     

考虑监测点建设紧迫性的电压暂降监测装置多目标优化模型
引用本文:周思宇,韩杨,杨平,王丛岭,张逸.考虑监测点建设紧迫性的电压暂降监测装置多目标优化模型[J].电力自动化设备,2022,42(2):217-224.
作者姓名:周思宇  韩杨  杨平  王丛岭  张逸
作者单位:电子科技大学 机械与电气工程学院,四川 成都 610054;电子科技大学 机械与电气工程学院,四川 成都 610054;电子科技大学 广东电子信息工程研究院,广东 东莞 523808;福州大学 电气工程与自动化学院,福建 福州 350108
基金项目:广东省自然科学基金资助项目(2018A030313494);新能源电力系统国家重点实验室开放课题项目(LAPS18007)
摘    要:为了实现电压暂降监测装置更加精准的布局,确保电网的稳定运行,提出了一种考虑监测点建设紧迫性的电压暂降监测装置多目标优化模型.首先,引入电压暂降幅度和电压暂降频率状态评估指标,建立监测装置建设紧迫性评估模型;然后,综合考虑系统监测点的建设紧迫性,基于电压暂降可观测矩阵,建立最小化建设紧迫性总权重和最小化可观测损失率的多目...

关 键 词:电压暂降  建设紧迫性  可观测损失率  多目标优化  帕累托最优前沿

Multi-objective optimization model of voltage sag monitoring devices considering construction urgency of monitoring nodes
ZHOU Siyu,HAN Yang,YANG Ping,WANG Congling,ZHANG Yi.Multi-objective optimization model of voltage sag monitoring devices considering construction urgency of monitoring nodes[J].Electric Power Automation Equipment,2022,42(2):217-224.
Authors:ZHOU Siyu  HAN Yang  YANG Ping  WANG Congling  ZHANG Yi
Affiliation:School of Mechanical and Electrical Engineering, University of Electronic Science and Technology of China, Chengdu 610054, China;School of Mechanical and Electrical Engineering, University of Electronic Science and Technology of China, Chengdu 610054, China; Guangdong Institute of Electronic and Information Engineering, University of Electronic Science and Technology of China, Dongguan 523808, China; College of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350108, China
Abstract:In order to achieve more accurate layout of voltage sag monitoring devices and ensure the stable operation of power grid, a multi-objective optimization model of voltage sag monitoring devices considering the construction urgency of monitoring nodes is proposed. Firstly, the state estimation indexes of voltage sag magnitude and voltage sag frequency are introduced to establish construction urgency evaluation model of monitoring devices. Then, comprehensively considering the construction urgency of monitoring nodes in the power system, a multi-objective optimization model is established based on voltage sag observability matrix with minimizing the total construction urgency weight and the loss rate of observability. An evaluation model of dissatisfactory degree is introduced, and the computational model of modified Pareto optimal front is established to analyze the coupling relationship between conflicting objectives. Finally, a practical transmission network with voltage level above 110 kV is taken as an example to obtain the optimal layout scheme, and the correctness and practical engineering application value of the proposed optimization model are verified by comparison with the traditional optimization model.
Keywords:voltage sag  construction urgency  loss rate of observability  multi-objective optimization  Pareto optimal front
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《电力自动化设备》浏览原始摘要信息
点击此处可从《电力自动化设备》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号