首页 | 本学科首页   官方微博 | 高级检索  
     


Simple heuristics for scheduling with limited intermediate storage
Authors:Andreas Witt  Stefan Voß
Affiliation:1. Salzgitter Flachstahl GmbH, Eisenhüttenstr. 99, D-38239 Salzgitter, Germany;2. Institut für Wirtschaftsinformatik, University of Hamburg, Von-Melle-Park 5, D-20146 Hamburg, Germany
Abstract:Limited storage capacities impose important restrictions in production planning and scheduling that can be used to control the work-in-process and must be taken into account when feasible schedules are to be generated. In this paper we consider a deterministic scheduling problem with limited intermediate storage. Contrary to other approaches known from the scheduling literature the intermediate storage is measured in material quantities that are associated with the jobs. Thus, a different consumption of space by the jobs inside the storage can be considered. Three heuristics are presented that are capable of taking into account limited intermediate storage. The procedures offer the opportunity to control the work-in-process formed by the jobs that wait for processing or are being processed in the production system.
Keywords:Intermediate storage  Heuristic scheduling  Steel manufacturer  Real-world problem  Flow shop
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号