Maintenance routing for train units: The interchange model |
| |
Authors: | Gábor Maróti Leo Kroon |
| |
Affiliation: | 1. CWI, Amsterdam and NS Reizigers, Utrecht, P.O. Box 94079, 1090 GB Amsterdam, The Netherlands;2. NS Reizigers, Utrecht and Erasmus University, Rotterdam, P.O. Box 1738, 3000 DR Rotterdam, The Netherlands |
| |
Abstract: | Train units need regular preventive maintenance. Given the train units that require maintenance in the forthcoming 1–3 days, the rolling stock schedule must be adjusted so that these urgent units reach the maintenance facility in time. In this paper, we present an integer programming model for solving this problem, give complexity results, suggest solution methods, and report our computational results based on practical instances of NS Reizigers, the main Dutch operator of passenger trains. |
| |
Keywords: | 90B06 90B10 90C35 |
本文献已被 ScienceDirect 等数据库收录! |
|