首页 | 本学科首页   官方微博 | 高级检索  
     

概率截断值对先进轻水堆核电厂应急计划区划分的影响
引用本文:黄挺,曲静原,曹建主.概率截断值对先进轻水堆核电厂应急计划区划分的影响[J].原子能科学技术,2012,46(5):585-589.
作者姓名:黄挺  曲静原  曹建主
作者单位:清华大学 ;核能与新能源技术研究院,北京100084
基金项目:国家重大科技专项经费资助项目
摘    要:1997年,美国核管会(NRC)在对被动与改进型先进轻水堆的应急计划进行评估后指出,在现有的技术框架下先进轻水堆的应急计划应当保持不变,但也表明如果考虑到严重事故发生概率更低,事故的延迟时间更长,则有可能简化对先进轻水堆的应急计划要求,减小应急计划区。这意味着,如果在事故选择时不考虑低于某一概率截断值的事故,则有可能对先进轻水堆核电厂应急计划区的划分产生较大的影响。本文以AP1000核电机组为例,参考美国NUREG-0396的方法,使用MACCS程序对选取不同事故概率截断值可能产生的影响进行研究。研究结果表明,只有当概率截断值高于某些相对概率较大、而后果较为严重的事故的发生概率时,才会对先进轻水堆应急计划区的划分产生较大影响。

关 键 词:先进轻水堆    应急计划    应急计划区    概率截断值

Impact of Cut-Off Probability on Emergency Planning Zone Sizing for Advanced Light Water Reactors
HUANG Ting , QU Jing-yuan , CAO Jian-zhu.Impact of Cut-Off Probability on Emergency Planning Zone Sizing for Advanced Light Water Reactors[J].Atomic Energy Science and Technology,2012,46(5):585-589.
Authors:HUANG Ting  QU Jing-yuan  CAO Jian-zhu
Affiliation:Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing 100084, China
Abstract:In 1997,NRC performed an evaluation of emergency planning for the evolutionary and advanced light water reactors,and indicated that no changes to emergency planning(EP) requirements were warranted in the existing technical framework.However,NRC also recognized if the lower probability of severe accidents or the longer time period between accident initiation and release of radioactive material was considered,the changes to EP requirements for advanced light water reactors might be warranted and the emergency planning zone(EPZ) sizing might be reduced.This means that if the accidents which probabilities are lower than a cut-off probability are not considered,there may be a significant impact on the EPZ sizing.AP1000 was selected as an example in this study and the probable impacts of different cut-off probabilities were studied by using MACCS code in accordance with the NUREG-0396 method.The results show that,only if the cut-off probability is higher than the occurrence probability of the accident which has relatively serious consequence and high probability,there will be a significant impact on the EPZ sizing for the advanced light water reactor.
Keywords:advanced light water reactor  emergency planning  emergency planning zone  cut-off probability
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《原子能科学技术》浏览原始摘要信息
点击此处可从《原子能科学技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号