首页 | 本学科首页   官方微博 | 高级检索  
     

淮河蚌埠段涉河桥梁工程防洪影响评价辅助决策系统研究
引用本文:戚晓明,徐新华,金菊良,胡孜军.淮河蚌埠段涉河桥梁工程防洪影响评价辅助决策系统研究[J].水利水电技术,2015,46(4):139-142.
作者姓名:戚晓明  徐新华  金菊良  胡孜军
作者单位:(1.蚌埠学院计算机科学与技术系,安徽蚌埠233000;2.安徽省水利部淮河水利委员会,安徽蚌埠233000; 3. 合肥工业大学土木与水利工程学院,安徽合肥230009;4.河海大学水利水电工程学院,江苏南京210098)
摘    要:随着流域河道岸线利用程度越来越高,各种已建、正建或拟建的涉河工程及滩涂开发利用使河流的水动力条件产生变化,带来了防洪和社会经济等方面的影响。根据建设方提交的工程信息预先生成涉河工程的防洪评价报告简本,使其与正式防洪评价报告对比分析,便于水行政主管部门科学决策。选择淮河干流中游蚌埠市区段25 km为研究对象,基于虚拟现实、3S、科学计算可视化技术及耦合水动力模型,研制淮河涉河工程防洪影响评价辅助决策系统;系统提高了淮河干流涉河工程项目信息管理水平,为水行政主管部门审批防洪评价报告及科学决策提供有益参考。

关 键 词:涉河工程  防洪评价  决策系统  信息化  淮河蛙埠段  
收稿时间:2014-07-18

Study on assistant decision-making system for flood control impact assessment on river-related bridge projects along Bengbu Section of Huaihe River
QI Xiaoming,XU Xinhua,JIN Juliang,HU Zijun.Study on assistant decision-making system for flood control impact assessment on river-related bridge projects along Bengbu Section of Huaihe River[J].Water Resources and Hydropower Engineering,2015,46(4):139-142.
Authors:QI Xiaoming  XU Xinhua  JIN Juliang  HU Zijun
Affiliation:(1.Computer Science and Technology department, Bengbu College, Bengbu233000, Anhui, China; 2.The Huaihe River Commission of the Ministry of Water Resources, P.R.C., Bengbu233000, Anhui, China; 3.School of Civil Engineering,Hefei University of Technology, Hefei230009,Anhui, China; 4.College of Water Conservancy and Hydropower,Hohai University,Nanjing210098,Jiangsu, China)
Abstract:Following with the higher and higher utilization of the river shoreline, various existed, under-construction and planned to be constructed river-related projects and the development and utilization of river shoal make changes to the river hydrodynamic conditions and then bring out the impacts on the aspects of flood control, social economy, etc. In accordance with the project information submitted by the project owner, a brief report for the flood control assessment on the river-related project can be pre-generated, and then it compares with the formal report for the scientific decision-making made by the water administrative authority concerned. Bengbu Section with the length of 25 km of the mid-mainstream of Huaihe River is taken herein as the study area, moreover, the assistant decision-making system for flood control impact assessment on river-related bridge projects along Bengbu Section of Huaihe River is developed based on the technologies of virtual reality, 3S and visualization in scientific computing as well as the coupled hydrodynamic model, which systematically enhances the information management level of the river related projects along the mainstream of Huaihe River, thus can provide beneficial references for the water administrative authority concerned to approve the relevant flood control assessment report as well.
Keywords:river related project  flood control assessment  decision-making system  informationization  Bengbu Section of Huaihe River    
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号