箱涵中继间法顶进施工技术
引用本文:吴振忠. 箱涵中继间法顶进施工技术[J]. 山西建筑, 2007, 33(1): 144-145
作者姓名:吴振忠
作者单位:中铁十七局集团五公司,山西,太原,030002
摘    要:结合工程实例,对开挖工作坑、后背制作、滑板制作、箱身预制、顶进施工等框架箱涵顶进施工工艺进行了阐述,并对顶进过程中需注意的问题进行了论述,最后对纠偏措施做了介绍,以推广该技术。

关 键 词:箱涵  顶进施工  纠偏措施
文章编号:1009-6825(2007)01-0144-02
修稿时间:2006-09-15

Box culvert middle-continuous methods inserting construction technology
WU Zhen-zhong. Box culvert middle-continuous methods inserting construction technology[J]. Shanxi Architecture, 2007, 33(1): 144-145
Authors:WU Zhen-zhong
Affiliation:WU Zhen-zhong
Abstract:Combined with the project practice, it elaborates frame box culvert insert construction crafts such as digging working hole, back programming, skateboard programming, box-body pre-programming and inserting construction, etc. And it discusses the problems which should be adverted in the inserting procedure. Finally, it introduces correcting measure in order to popularize this technology.
Keywords:box culvert   insert construction   correcting measure