首页 | 本学科首页   官方微博 | 高级检索  
     

重力码头地震旋转与滑动耦合运动下的残余位移简易算法
引用本文:刘汉龙,王丽艳.重力码头地震旋转与滑动耦合运动下的残余位移简易算法[J].岩土工程学报,2009,31(5):686-691.
作者姓名:刘汉龙  王丽艳
作者单位:河海大学岩土力学与堤坝工程教育部重点实验室;河海大学岩土工程科学研究所;江苏科技大学土建学院;
基金项目:国家自然科学基金重点项目,江苏省青蓝工程创新团队资助项目 
摘    要:预测重力码头的地震残余位移是码头工程地震设计的关键,而码头墙后回填砂土因地震引起的超静孔隙水压力发展水平对码头墙体运动具有一定的影响。引用液化度概念考虑超静孔隙水压力影响来修正Mononobe-Okabe拟静力法计算的动主动土压力和回填土地震孔隙水产生的动水压力;同时考虑水平和竖向地震载荷,采用Steedman的旋转块体法,根据力与力矩极限平衡确定码头的滑动与旋转门槛加速度系数,分别对码头滑动先开始与倾斜先开始两工况下的耦合运动模式进行详细分析,修正码头因耦合运动影响的滑动与旋转门槛加速度系数,计算码头耦合运动下的地震残余位移计算。选用正弦脉冲的地震运动特征,应用该计算方法对码头耦合运动的残余位移的闭合解进行了推算,分析了码头残余位移随着液化度变化的规律。

关 键 词:重力式码头  地震  拟静力法  液化度  门槛加速度系数  旋转块体  残余旋转位移  残余滑动位移  

Seismic residual displacement of gravity quay walls under coupled motion between rotation and sliding by simple method
LIU Hanlong,WANG Liyan.Seismic residual displacement of gravity quay walls under coupled motion between rotation and sliding by simple method[J].Chinese Journal of Geotechnical Engineering,2009,31(5):686-691.
Authors:LIU Hanlong  WANG Liyan
Affiliation:1.Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering Hohai University Nanjing 210098 China 2.Geotechnical Research Institute Hohai University Nanjing 210098 China 3.School of Civil and Architectural Engineering Jiangsu University of Science and Technology Zhenjiang 212003 China
Abstract:Predicting the residual displacements induced by earthquake loading is a key to the seismic design of quay walls,and the motion of quay walls is influenced to some extent by the excess pore water pressure in the backfill acting on the back of quay walls.Considering the effect of excess pore water pressure in the backfill acting on the back of quay walls,the Mononobe-Okabe equivalent static method of calculating the dynamic active earth pressure and the dynamic water pressure in backfill soil is modified by the index of extent of liquefaction.Considering both the horizontal and vertical earthquake waves,the rotation block method of Steedman is applied.The sliding and rotation threshold acceleration coefficients are confirmed by the equilibrium of forces and moments respectively.Two situations of coupled motion with sliding starting first and rotation starting first are analyzed,the sliding and rotation threshold acceleration coefficient are modified because of the effect of coupled motion,and the calculation method of residual displacement of gravity quay walls is developed primarily.An example is shown by the present method under a sine wave of ground motion,and some laws are discussed simply between the extent of liquefaction and the seismic residual displacement.
Keywords:gravity quay wall  earthquake  pseudo-static method  extent of liquefaction  threshold acceleration coefficient  rotating block method  residual rotational displacement  residual sliding displacement
本文献已被 万方数据 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号