首页 | 本学科首页   官方微博 | 高级检索  
     


A new method for assembly line balancing having stochastic work elements
Authors:A. Raouf  C.L. Tsui
Affiliation:Department of Industrial Engineering, University of Windsor, Windsor, Ontario, Canada N9B 3P4
Abstract:The main feature of the method suggested in this paper is the assignment of priority to elements and priority elements are preferred to non-priority elements when assigning elements to stations. It accepts element times from known or unknown symmetrical distributions, minimizes the variation within a station and allows assignments of elements to stations such that each station time does not exceed the probability confidence levels set by management.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号