三峡工程永久船闸水力学研究
引用本文:须清华,宣国祥.三峡工程永久船闸水力学研究[J].中国三峡建设,1998(9):1-4,35.
作者姓名:须清华  宣国祥
作者单位:南京水利科学研究院!江苏南京,210029,南京水科院
摘    要:三峡工程永久船闸总水头为113m,为双线连续五级,中间级最大水头达45.2m,超过了国内外已建大型船闸的水平,其水力学问题十分复杂,通过多年来大量的试验研究,选用双侧主廊道四区段领先八支管动力平衡输水系统,输水阀门向弧形门,门后廊氏部吾突扩体型,门楣处减蚀措施,采用快速开启阀门和提前关闭阀门,以消除闸室水面惯性超高的不利影响,进水口旁侧取水方式等,不仅满足各项设计要求,并能保证船闸的安全运行。

关 键 词:三峡工程  永久船闸  水力学

Hydraulic Researches for Permanent Shiplock
Xu Qinghua and Xuan Guoxiang.Hydraulic Researches for Permanent Shiplock[J].China Three Gorges Construction,1998(9):1-4,35.
Authors:Xu Qinghua and Xuan Guoxiang
Affiliation:Xu Qinghua and Xuan Guoxiang
Abstract:With a total head of 113 m and a maximum head for the mediate step of up to 45. 2 m, which exceed the size of any project completed up to date in China and abroad, the TGP permanent two - way and five - step shiplock has many very complicated hydraulic challenges. Through numerous experimental studies for years, it has been determined that a dynamic equilibrium system will be selected, including a main water gallery, two sections and four bypasses arranged at each side, reverse radial gates, sudden enlargemental bottom bihind the gates, air devices arranged at the lintels,va1ves that can be high - speed started and shut - off in advance for eliminating the adverse impact due to inertial sudden raise or drop of water surface, and intakes and outlets arranged at either side, which can not only meet the design requirements but also ensure the safe operation of the shiplock.
Keywords:Three Gorges Project (TGP) Permanent shiplock Hydraulic study